Go to content
  • About us
  • Press
  • Contact
  • Norsk
Our Webpages
  • Skagerak Kraft
  • Skagerak Energi
image/svg+xml
  • Power plants
  • Watercourses
  • Environment
  • Power trade
  • Power plants
    • Projects
      • Sauland Power Plant
        • Impact assessment
          • Hydrology
          • Landscape and cultural heritage
          • Natural environment
          • Society
          • Natural resources
          • Mitigating measures
          • Watercourse pictures
  • Our Webpages
  • Skagerak Kraft
  • Skagerak Energi
  • Norsk
  • News Archive
  • About us
  • Press
  • Contact
  • Frontpage
  • Power plants
  • Projects
  • Sauland Power Plant
  • Impact assessment
  • Hydrology

Hydrology

Vassføring

The development of Sauland Power Plant will cause Hjartdøla river to be warmer in the summer and nearly at thermal equilibrium with its surroundings.

  • Water temperature and freezing

    Hjartdøla river will freeze more often during the winter than is currently the case. The water downstream of the power plant outlet will have greater temperature variations throughout the day than is currently the case, in summertime as well as winter. The average daily temperature downstream of the power plant will change somewhat: it will be slightly higher in winter and slightly lower in summer.
    Between the power plant outlet and Heddalsvatn lake, variable freezing conditions will occur. The river will therefore mainly run freely, except for in still, deep sections closest to Heddalsvatn lake.
    In Skogsåa river, no significant changes in temperature conditions are expected. However, the river could freeze a few days earlier as a result of lower water volume.
    Small changes are expected in the temperature and freezing conditions of Hjartsjåvatn, Sønderlandsvatn and their side streams.

  • Hydrogeology, water supply, geothermal energy, water quality and pollution

    Reduced flow in Hjartdøla and Heddøla rivers will reduce the ground water level closest to the rivers. The changes will be most obvious in the area where the ground water level increased following the establishment of Hjartdøla Power Plant and the occurrence of ‘water-sick soil’.
    During the construction phase, it is inevitable that the municipal waterworks and a few private wells will be temporarily affected. Necessary measures will be implemented to secure the water supply.

    Recipient conditions downstream of the municipal treatment plant’s outlet will change after Sauland Power Plant is built. The water quality and recipient conditions are expected to remain good/satisfactory following the potential construction of Sauland Power Plant. It is unlikely that the development of Sauland Power Plant will affect the potential for utilising geothermal energy.

    Konsekvenser
    Area of impactDegree of impact
    Erosion and sedimentationLow negative
    Local climateInsignificant
    Sea smokeMedium positive
    Hydrogeology and water supplyLow negative
    Geothermal energyInsignificant
    Pollution and water qualityLow negative

    The environmental impact assessments were carried out by Norconsult, the Norwegian Meteorological Institute and the Norwegian Water Resources and Energy Directorate.

     

  • Local climate and sea smoke

    The construction of Hjartdøla Power Plant resulted in several days of sea smoke along Hjartdøla river. After the construction phase of Sauland Power Plant, it is expected that sea smoke will be a rare occurrence. Otherwise, the development will have very little affect on the climate.

  • Erosion and sedimentation

    Lower flow reduces the potential for erosion of the rivers. Erosion processes will continue to occur in the future, but on a smaller scale than today.

  • Email page
Share on:
  • Share on Facebook
  • Share on LinkedIn
  • Share on Twitter

Power plants

  • Our power plants
    • Bagn
    • Bjordalen
    • Breive Pumping Station
    • Brokke
    • Dalsfos
    • Duge Pump Power Plant
    • Eidet
    • Finndøla
    • Fjone
    • Grunnåi
    • Grytåi
    • Grønvollfoss
    • Haukrei
    • Hekni
    • Hjartdøla
    • Hjorteland Pumping Station
    • Hogstad
    • Holen
    • Hylen
    • Hølseter
    • Jukla
    • Kammerfoss
    • Kiste
    • Kvilldal
    • Kvinen
    • Langfos
    • Mauranger
    • Mydalen
    • Nape
    • Rolleivstad Pumping Station
    • Roskrepp
    • Sagfossen
    • Saurdal Pump Power Plant
    • Skarg
    • Skarje Pumping Station
    • Skollenborg
    • Solhom
    • Stølsdal Pump Power Plant
    • Sundsbarm
    • Svelgfoss
    • Tisleifjord
    • Tjørhom
    • Toklev
    • Tonstad
    • Tveitereidfos
    • Uvdal 1
    • Uvdal 2
    • Vafos
    • Vrenga
    • Åbjøra
    • Åna-Sira
    • Årlifoss
    • Ala
  • Projects
    • Sauland Power Plant
      • Impact assessment
        • Hydrology
        • Landscape and cultural heritage
        • Natural environment
        • Society
        • Natural resources
        • Mitigating measures
        • Watercourse pictures
      • Documents
      • About Sauland
      • News
    • Ala Power Plant
    • New Dalsfos Power Plant
    • Gjuvåa Power Plant
    • Vinda Power Plant
    • Håtveitåi
    • Skagerak EnergiLab
    • Vrenga and Hølseter
    • Grunnåi Power Plant
  • Visitor Power Plant
  • Share on Facebook
  • Go to Youtube
  • Go to LinkedIn
39

Postboks 80

3901 Porsgrunn

Org.nr: 979 563 531

contact_phone +47 35 93 50 00

contact_adress firmapost.kraft@skagerakenergi.no

  • News Archive
Privacy and Cookies
Delivered by: Coretrek | Content Management Solution: CorePublish