The pressure in Sauland Power Plant’s wells will be monitored. Large areas of Sauland Power Plant’s tailrace tunnel containing water-bearing cracks are set to be repaired. If the water level in the ground water reservoir nonetheless falls, then smaller areas with water-bearing cracks must also be repaired.

Temporary and any permanent changes in capacity/quality of private drinking water sources caused by the measure will be followed up and remedied where necessary.