Facts about Støylsdalen

(All figures are tentative estimates)
Location: Håtveitåi in Nissedal municipality, Telemark county.
Production: Approx. 8 GWh
Waterfall: 330 metres
Penstock: 3.9 km
Cost: Approx. NOK 37 million
Fall rights: Skagerak Kraft (100%)

Facts about Klovefoss

(All figures are tentative estimates)
Location: Håtveitåi in Nissedal municipality, Telemark county.
Production: Approx. 5 GWh
Waterfall: 92 metres
Penstock: 0.6 km
Cost: Approx. NOK 20 million
Fall rights: Skagerak Kraft (100%)

Støyldalen Power Plant will produce about 8 GWh/year in an average year, which is equivalent to the power consumption of approx. 400 households. Klovefoss Power Plant will have the capacity to produce about 5 GWh/year, which is equivalent to the power consumption of approx. 250 households. The development costs for Støyldalen are estimated to be approx. NOK 37 million, and for Klovefoss, approx. NOK 20 million.

Støylsdalen

On 7 December 2016, the Norwegian Water Resources and Energy Directorate (NVE) granted a licence for Støyldalen Power Plant. The decision was appealed, and the case is now with the Ministry of Petroleum and Energy for final consideration.

Please refer to the Norwegian Water Resources and Energy Directorate (NVE) for more information about the licensing case.

Klovefoss

On 7 December 2016, the NVE denied the licence application for Klovefoss Power Plant. Skagerak prepared an application for a plan change in cooperation with the landowners, which was subsequently submitted to the NVE in winter 2017. After its consideration, the NVE granted a licence for Klovefoss Power Plant on 22 June 2017. This decision has also been appealed and is now with the Ministry of Petroleum and Energy for final consideration.  

Please refer to the Norwegian Water Resources and Energy Directorate (NVE) for more information about the Klovefoss licensing case.