-
Map of development area
-
Technical data (licensed solution)
Technical data Main data Sauland 1 Sauland 2 Total Catchment area 481 km2 184 km2 665 km2 Gross waterfall height 111 m 351 m Installed output 25.5 MW 50.5 MW 76 MW Power plant flow rate 28 m3/s 17 m3/s 45 m3/s Annual production 90 GWh 115 GWh 205 GWh Power supply to households approx. 10,250 -
Owners
Sauland kraftverk AS was established in Hjartdal, Norway on 27 June 2012. The company is owned by Skagerak Kraft, Hjartdal municipality, Notodden Energi and local landowners.
- Owners’ shares (as of June 2013):
- Skagerak Kraft, 67%
- Notodden Energi, 16.2%
- Hjartdal municipality, 14.35%
- Local waterfall owners, approx. 2.45%
-
Contact information
Sauland kraftverk AS
Managing Director: Bjarte Guddal
Email: bjarte.guddal@skagerakenergi.no
Telephone: (+47) 90 61 86 87Address:
Sauland kraftverk AS
co/Skagerak Kraft AS
Hjartdalsvegen 431
NO-3690 Hjartdal, NorwayInvoice address:
Sauland kraftverk AS
co/Skagerak Kraft AS
Postboks 80
NO-3901 Porsgrunn, Norway